ASRR

Planning integrations · ASRR Tech

Connect CRM to your website, Outlook or accounting: a dependable design

Start integration design with source ownership, identifiers and recovery. Use this data matrix and acceptance tests to define what website, calendar and accounting connections actually need to exchange.

Updated · 3 min read · ASRR Tech

“There is an integration” is not a scope

A product logo does not establish which information is exchanged. Ask about direction, fields, timing, supported accounts, permissions and failure handling. Reading customers from accounting differs from creating invoices or retrieving payments.

Define the supported task first: an actionable website enquiry, reliable booking availability and appointment, or a specific accounting data flow.

This guide provides design questions. Availability and configuration of any particular Alpha integration must be confirmed for the actual scenario.

Assign a source for each field

InformationPossible sourceDestinationRequired decision
Original requestWebsite formCRMPreserve text or transform it?
Record ownerCRMWork queueMay another system overwrite it?
Busy timeCalendarBooking routeWhich calendars and appointment types count?
QuotationAgreed sales systemConnected systemWhich version and status?
Invoice/paymentAccountingCRM displayRead only or also write?

This illustrative matrix is not standard product behaviour. Avoid two systems writing the same field back unchecked. Define the controlling source and who resolves conflicts.

Preserve stable references

Names and email addresses are insufficient technical keys. Names change and one email can represent several contexts. Preserve source identifiers with destination records and explicit relationships.

Identify technical submissions. Replaying the same submission after a failure should produce the same identifiable result rather than another lead, appointment or invoice.

Separate this from a new business request. The same person can legitimately make another enquiry. Technical event repetition differs from repeated customer interest.

Design failures alongside the normal route

Specify timeout, expired access, invalid fields, removed records and temporary outage behaviour. Decide what can be retried and what needs human review.

Microsoft Graph documents timely webhook responses and maintaining notification subscriptions. A successful initial connection does not prove continued synchronisation.

Keep a visible processing result and an error owner. “Last sync succeeded” is too broad when one record failed. Staff must identify the particular enquiry still needing attention.

Calendar availability differs from appointment handling

Graph getSchedule retrieves availability. Creating, updating, cancelling and providing an online meeting are additional capabilities requiring separate tests.

Define the organiser account, source calendar and origin of changes. A CRM appointment can exist without an external invitation. Inspect both sides with a test employee and external participant.

Walk through a fictional website failure

A form is stored, but the browser never receives the response. The visitor retries. Without submission recognition, the intake team may receive two records.

A reliable design recognises the repeat, retains one enquiry and provides a clear confirmation state. If CRM processing is pending, its owner must be visible internally. Do not hide the difference between received and completed behind one success message.

Supplier acceptance matrix

  • A request arrives with original context and source reference.
  • Replaying a technical event does not duplicate its outcome.
  • Missing required destination information becomes a reviewable error.
  • Updates travel only in the agreed direction.
  • Temporary failures can be recovered in a controlled way.
  • Cancellation and deletion follow an explicit rule.
  • Only the intended organisation and users can access the result.

Test representative records in an agreed environment and document each outcome. Establish ongoing administration before delivery. Continue with appointment tests and automation selection.

Sources and editorial approach

Sources consulted on 12 October 2026. Inline references support the stated facts. ASRR compiled the workflows, matrices and fictional examples for this explanation. Example prices and outcomes are not customer results, prices or benchmarks. Other vendors’ documentation does not establish availability in Alpha.